ASELSANNET OSMANİYE LARGE WAREHOUSE FACILITY
Kaba İnşaat İşleri • Osmaniye – Toprakkale (2026)
About the Project
Executed in 2026 in Osmaniye – Toprakkale for Kilic Group, this project covered the full structural concrete execution for the Large Warehouse Facility. Works include formwork and shoring systems, structural rebar placement, mass concrete pouring, and site logistical controls. Operations are synchronized with CPM schedules, quality assurance frameworks, and strict HSE protocols in accordance with technical specifications.
Services Rendered Across Project
- Formwork & Falsework Shoring Erection
- Reinforcing Steel Fabrication & Installation
- Structural Concrete Pouring & Curing Controls
- Site Supervision & Quality Assurance Auditing
- Material, Plant & Logistics Resource Planning
Related Projects
MERINOS MTR PROJECT
250.000 m² • Gaziantep
SASA PTA PRODUCTION COMPLEX
375 Dönüm • Adana (Seyhan)
TEIAS SUBSTATION SWITCHYARD PERIMETER FENCING
Trafo Merkezleri Şalt Sahaları • Kozan – Erzin – Hatay
71 COLEBROOK ST RESIDENCE
Nitelikli Konut • Winchester, Birleşik Krallık
AKENERJI ERZIN COMBINED CYCLE POWER PLANT
600.000 m² / 900 MW • Hatay (Erzin)
Have a Similar Construction Project?
Let's plan your BIM and data management frameworks together.
Contact Us
STREAMLINE YOUR PROJECT
Manage Construction With Data Analytics, Not Guesswork
Get in touch with our engineering team for BIM coordination, budget controls, and site execution.